Key Advantages
- Engineering Infrastructure: All essential utilities are connected — water supply/sewerage (up to 45 m³/day), electricity (up to 3 MW), gas (up to 3 MW), high-speed internet, and security systems.
- Transport Accessibility: Strategically located at the intersection of key transport corridors of the Volga region and the Urals.
- Tax Incentives: Resident status in a Territory of Advanced Development (TOR) provides tax benefits, including 0% federal profit tax, land tax, and property tax for 10 years.
- Ready Infrastructure: Fully developed engineering infrastructure ready for immediate connection of production facilities.
- High-Quality Construction: Use of modern technologies and materials compliant with international standards.
- Favorable Business Environment: Strong regional economy and active support from local authorities.
Technical Specifications
- Floor Load Capacity: 9 tons/m²
- Ceiling Height: 12 meters
- Column Grid: 12×24 meters
- Floors: Superflat with reinforced dust-proof coating (FM2 Special)
- Dock Levelers: Automatic with door seals
- Wall Panels: 0.6 mm steel sheet, 150 mm stone wool insulation, thermal resistance 5.55 m²·°C/W
- Roofing: PIR insulation panels, zero water permeability
- Equipment: Loading dock equipment, integrated control unit, 6-ton lifting capacity
- Doors: ALUTECH, up to 100,000 opening/closing cycles
Operation
- 24/7 service
- Continuous technical and administrative support, seven days a week
- Security, video surveillance, and access control 24/7
- Integrated security system with monitoring and access management
- Maintenance of engineering infrastructure and buildings
- Scheduled and emergency repair works
- Cleaning of common areas
Leave a request for cooperation
and we will contact you shortly to discuss the details.


